Case details
The export lists 2 inspection(s) and 3 contact entry or entries for this case. Status is a snapshot from the supplied workbook, not a live feed.
Reported issues
ORDINANCE: BEM BUILDING EXTERIOR MAINTENANCE SECTION 8-20.2 (E): OF THE MUNICIPAL CODE OF ORDINANCES OF THE CITY OF CORAL SPRINGS, FLORIDA: OWNERS SHALL BE PRIMARILY RESPONSIBLE FOR THE MAINTENANCE OF BUILDINGS, STRUCTURES AND EXTERIOR PREMISES WHETHER OR NOT SUCH RESPONSIBILITY HAS BEEN ASSIGNED TO OR ACCEPTED BY ANOTHER PARTY. VIOLATION: FAILURE TO MAINTAIN THE BUILDING, STRUCTURES AND OR EXTERIOR PREMISES. CORRECTIVE ACTION: PROPERTY OWNERS SHALL BE RESPONSIBLE FOR THE MAINTENANCE OF STRUCTURES, BUILDINGS AND EXTERIOR PREMISES.
Case status in source: ActiveORDINANCE: FH2 FENCE HEDGES SECTION 250128 (14) OF THE LAND DEVELOPMENT CODE OF ORDINANCES OF THE CITY OF CORAL SPRINGS, FLORIDA: FENCES SHALL BE SCREENED WITH A HEDGE ALONG EACH PERIMETER ADJACENT TO A STREET, CANAL RIGHT-OF-WAY, A LINEAR SEPARATE PARCEL THAT LIES BETWEEN A PUBLIC RIGHT-OF-WAY AND THE PROPERTY LINE TO BE FENCED OR OTHER WATER BODY. VIOLATION: FAILURE TO MAINTAIN HEDGE MATERIAL AROUND FENCING. CORRECTIVE ACTION: INSTALL HEDGE MATERIAL AS REQUIRED.
Case status in source: ActiveORDINANCE: MLSR MINIMUM LANDSCAPE REQUIREMENTS SECTION 250833 OF THE LAND DEVELOPMENT CODE OF ORDINANCES OF THE CITY OF CORAL SPRINGS, FLORIDA: FAILURE TO MEET MINIMUM LANDSCAPE REQUIREMENTS. VIOLATION: FAILURE TO MEET MINIMUM LANDSCAPE REQUIREMENTS. CORRECTIVE ACTION: INSTALL TREES AND OR SHRUBS TO MEET MINIMUM LANDSCAPE REQUIREMENTS.
Case status in source: ActiveORDINANCE: BP EXPIRED PERMIT SECTIONS 5-0.6 (B) OF THE MUNICIPAL CODE OF ORDINANCES OF THE CITY OF CORAL SPRINGS, FLORIDA: IF SUCH PERMIT BECOMES INVALID, NO NEW PERMIT SHALL BE ISSUED COVERING THE SAME WORK OR ANY PORTION THEREOF IF THE EFFECT OF SUCH PERMIT WOULD BE TO ALLOW COMPLETION OF THE WORK BEGUN UNDER THE ORIGINAL PERMIT. FURTHERMORE, ANY STRUCTURAL WORK PARTIALLY COMPLETED ON THE PROPERTY WHERE THE PERMIT BECAME INVALID SHALL BE REMOVED AND THE PROPERTY CLEANED TO THE SATISFACTION OF THE BUILDING OFFICIAL. IF THE PROPERTY OWNER OR HOLDER OF THE INVALIDATED PERMIT FAILS TO REMOVE THE STRUCTURE AND CLEAN THE PROPERTY WITHIN THIRTY (30) DAYS OF THE INVALIDATION DATE, THEN THE BUILDING OFFICIAL MAY TAKE THE NECESSARY ACTION TO HAVE THE STRUCTURE REMOVED AND THE PROPERTY CLEANED WITH ALL COSTS ASSESSED AS A LIEN ON THE PROPERTY. VIOLATION: EXPIRED PERMIT. CORRECTIVE ACTION: RENEW AND FINALIZE BUILDING PERMIT(S).
Case status in source: ActiveIRIZARRY,MINERVA H/E IRIZARRY,GUS